1·Click to rename the selected gantt chart.
单击此处可重命名所选甘特图。
2·We didn't have a Gantt chart, because we didn't need one.
我们没有绘制甘特图,因为我们并不需要它。
3·The Gantt chart in Part 1 outlined our Phase 1 work packages.
第1部分中的甘特图描述了我们第1阶段的工作任务包。
4·In the schedule control, the main tools are Gantt chart and check list.
在进度控制方面,使用的主要工具是甘特图和核查清单。
5·Gantt chart is an effective tool for planning and controlling project schedule.
甘特图是工程项目进行工期计划和控制的有效工具。
6·Plan the project using tools such as Gantt chart, PERT chart, planning trees, etc.
使用甘特图、PERT图、策划树等工具策划项目。
7·Figure 2: Gantt chart based on dependencies between architecturally significant elements.
图2:基于架构设计中重要元素之间依赖性的甘特图。
8·You can imagine them building up the Gantt chart as they go, filling in more and more detail.
您可以想象他们这么做实际上是在构建一幅越来越详细的甘特图(Gantt chart)。
9·A modified Gantt chart that schedules capacity by entire department or specific resources.
一种改进的甘特图,它具有能列出全部部门或者是特定的资源的能力。
10·The advantages of the Gantt chart are its simplicity, ease of preparation and use, and low cost.
甘特图形的优势是其简洁,便于准备和使用,且成本低。